Planned data centres would need a third as much power as the whole of Cape Town at its peak
1,096MW All other Cape Town demand · Highest
Select a bar to inspect its value.
Together they would need 580 MW, which is 34% of the city’s current peak. The biggest, Cavaleros at 360 MW, would be the largest data centre ever built in South Africa.
Source: City of Cape Town, Cavaleros Group, Equinix and Teraco · All bars start at zero