Diesel went up R4.96 a litre in May 2026, petrol only R1.85

4.96R per litre Diesel 0.05% (wholesale) · Highest

Diesel and paraffin went up about two and a half times as much as petrol. Their prices had more catching up to do, and a temporary R3.00 cut in the fuel levy applied to petrol only.

How much each fuel went up per litre in May 2026
R per litre Petrol 95 (coast): 1.85 R per litre Petrol 95 (coast) 1.85 Petrol 93 (coast): 1.77 R per litre Petrol 93 (coast) 1.77 Diesel 0.05% (wholesale): 4.96 R per litre Diesel 0.05% (wholesal… 4.96 Diesel 0.005% (wholesale): 4.96 R per litre Diesel 0.005% (wholesal… 4.96 Illuminating Paraffin: 4.22 R per litre Illuminating Paraffin 4.22

Select a bar to inspect its value.

View data table
ObservationR per litre
Petrol 95 (coast)1.85
Petrol 93 (coast)1.77
Diesel 0.05% (wholesale)4.96
Diesel 0.005% (wholesale)4.96
Illuminating Paraffin4.22
Source: Central Energy Fund · 1 Apr 2026 – 31 May 2026 · All bars start at zero
Download imageShare image link
From our storiesCape Town Fuel Prices, Week of 6 May 2026: What You Will PayRead the full story →

Method and sources

Each bar is the rand-per-litre increase applied in the May 2026 fuel price adjustment, as printed in the article's own chart. Values are added to the previous month's price, not the price itself.
Petrol 95 (coast): +R1.85.
Petrol 93 (coast): +R1.77.
Diesel 0.05% (wholesale): +R4.96.
Diesel 0.005% (wholesale): +R4.96.
Illuminating Paraffin: +R4.22.
The article describes the figures as projected from Central Energy Fund data through 30 April 2026 for the adjustment effective in May 2026, so the period runs from 1 April to 31 May 2026.
Sources: Central Energy Fund (https://www.cefgroup.co.za/) The link is to the publisher, not the exact table.

Figures as published in our article on Cape Town fuel prices for the week of 6 May 2026 (chart last checked 14 September 2026): Central Energy Fund data through 30 April 2026.

Chart updated · 26 Oct 2026. The observation dates above describe the data, not today’s conditions.

Related charts

Energy 31 Dec 2026

Planned data centres would need a third as much power as the whole of Cape Town at its peak

1,096MW All other Cape Town demand · Highest

Power needed by four planned data centres, compared with the city’s peak demand of 1,676 MW
Cavaleros (Cosmas Data City): 360 MW Cavaleros (Cosmas D… 360 Equinix (two facilities): 160 MW Equinix (two facili… 160 Teraco: 60 MW Teraco 60 All other Cape Town demand: 1,096 MW All other Cape Tow… 1,096

Select a bar to inspect its value.

Together they would need 580 MW, which is 34% of the city’s current peak. The biggest, Cavaleros at 360 MW, would be the largest data centre ever built in South Africa.

Source: City of Cape Town, Cavaleros Group, Equinix and Teraco · All bars start at zero